Name of project
Nowy Świat 2.0
Location
Nowy Świat 2.0 is located in the most exclusive part of Warsaw, by the Royal Route – between Warsaw Stock Exchange, Centrum Bankowo-Finansowe “Nowy Świat” and Three Crosses Square. It is a guarantee of a perfect business environment i.a. key financial institutions, the Sejm and the Senat buildings.
Date of completion
December 2015 r.
Name(s) of investor(s)
Centrum Bankowo-Finansowe “Nowy Świat” SA
Developer
Centrum Bankowo-Finansowe “Nowy Świat” SA
Number of above-ground floors
6
Number of underground floors
2
Standard (class A, class B, class C)
CLASS A
BREEAM/LEED/sustainability certification
Nowy Świat 2.0 is characterized by a modern architecture and an effective use of space by tenants. The unique building’s shape of a wave alongside a distinctive arc creates a space that has been converted into an intimate town square. Such innovative technological and ecological solutions as high-speed elevators, BMS, LEED certificate as well as energy and water consumption saving system have been applied in the building.
Architect
AMC – Andrzej M. Chołdzyński Sp. z o.o. – Sp. Komandytowa
Construction company
KARMAR S.A.
Property Management Company
Centrum Bankowo-Finansowe “Nowy Świat” S.A.
Main tenants
Polska Grupa Zbrojeniowa, Greenberg Traurig, Aksonometria Studio
Source of project financing
ARP, MS TFI, own resources
Functionality
It’s a five-storey, glass office building, which features retail and commercial usable area. The building’s underground parking features approx. 37 parking spots; there is also a bicycle parking along with a locker room. Nowy Świat 2.0 provides maximal level of comfort. It is also characterized by a modern architecture and an effective use of space by tenants.
The technical systems and innovations to improve office working conditions/comfort
The building designed, constructed and fitted out in line with the guidelines of the international LEED certification system. Such innovative technological and ecological solutions as high-speed elevators, BMS, LEED certificate as well as energy and water consumption saving system have been applied in the building.
Technical innovations
BMS with optimal control of power consumption, automatic air-conditioning system with an efficiency control and an option to turn off redundant lights, a system reducing hot water usage at times when demand is lower, high efficiency electric equipment, automatic external and internal lighting control system.
Number of parking spaces (per sqm office space)
1/100
Facility's website
http://nowyswiat20.pl