City Point Okęcie is an 11,000 sqm, fully leased BTS logistics facility developed by Peakside Capital Advisors and Partners Group next to Warsaw Chopin Airport. The project achieved BREEAM Outstanding certification with an exceptional score of 92.3% and won the PLGBC Green Building Award 2026. It is among the first industrial buildings worldwide pursuing LEED v5 New Construction certification. A pioneering sustainability feature is Poland's first use of RUUKKI LowCarbon façade panels made with SSAB Zero™ steel, reducing embodied carbon. The facility features a 450 kWp photovoltaic installation, heat pumps, an advanced BMS and a cool roof. Rainwater harvesting and greywater reuse help reduce potable water consumption by up to 65%, while rain gardens and flower meadows enhance biodiversity. Designed with EU Taxonomy requirements in mind, City Point Okęcie combines operational efficiency, climate resilience and long-term investment value.
Name of project
City Point Okęcie
Location
Warsaw
Date of accupancy permit issuance
2025-08-31
Total area
50000
GLA
11000
Type (BTS/MT)
BTS
Key tenants
Welcome Airport Services
Investor(s)
Developer
Peakside Capital Advisors
Architect
Construction company
Depenbrock Polska
Source of project financing
mBank
Leasing agency
No external leasing agency involved
The occupancy in on within the timeframe specified by the organizer