Maciej Runkiewicz has been involved in the construction sector since 1995. Since 2001, he has been working for Kajima, a Japanese general contractor specializing in large-size buildings. He has gone through all career levels here, first as a Project Director in charge of construction of production facilities. Currently, as the President of the Company’s Management Board, he leads its over 190 employees and is fully accountable for the overall business of Kajima Poland.
|
Company description including the major achievements on commercial real estate
General contracting in the design & build system is the core of Kajima Poland’s services. We specialize in large volume construction, short delivery times, and expanding existing buildings without disrupting the production or logistics activity of their operational parts. Our portfolio includes over 130 facilities built for recognized Polish and international brands. KAJIMA Poland builds its resources and strong market position in accordance with ESG guidelines. The high rating of Kajima Poland in terms of ESG is confirmed by EcoVadis (Silver Medal). In 2021 we were certified as meeting ISO 14001:2015 certification for environmental management. To complement our activities related to meeting the widely understood environmental protection, sustainable development, and ESG requirements, we joined the UN Global Compact in 2022. We have been a member of PLGBC Association since 2021. We SUPPORT “BUILDER FOR THE YOUNG ENGINEERS” an educational and promotion program for young engineers.
|
Major current clients
Panattoni, 7R, Nestle Purina, CTP, P3, Viessmann, EQT Exeter, Hines, Waimea, Viessman, Frigo Logistics, LemonTree, Student Depot, Pekaside Capital Advisors, NGK Ceramics, Amazon, Mondelez
|
Key projects constructed between July 2022 and June 2023
7R Park Łódź East I /DC2&DC3/ 64,000 sqm
7R Park Kielce, Chęciny / 31,175 sqm Panattoni Park Zabrze II / 17,150 sqm CTPark Warsaw South, Mszczonów / 77,850 sqm Panattoni Park Łódź West, Niesięcin / 39,835 sqm EQT Exeter Park Świebodzin / 136,000 sqm Nestle Purina phase 7/ 20,396 sqm Panattoni Park Bydgoszcz IV (Aldi)/ 61,000 sqm Panattoni BTS Carrefour, Bydgoszcz / extension 5,000 sqm, reconstruction of part of the existing warehouse 9,500 sqm Hines, Hipark Rzepin / 52,000 sqm Panattoni BTS TEDi, Stargard / 87,000 sqm Panattoni Park Pabianice, Neonet / 44,000 sqm Viessmann, Legnica / package of preparatory works |
Projects under construction
Amazon / warehouse modernization WRO 1, WRO 2, WRO 5, POZ 1
Mondelez Polska, Płońsk / factory – extension Frigo Logistics, Żnin / Freezer warehouse complex with office building – extension / 6,540 sqm 7R, Kąty Wrocławskie / warehouse / 41,882 sqm Panattoni Campus II / warehouse / 30,056 sqm P3 Mszczonów Park / warehouse / 20,243 sqm CTPark Warsaw South, Mszczonów / 66,499 sqm NGK Ceramics / ground-mounted photovoltaic power plant / 21,100 panels Frigo Logistics / Freezer warehouse complex (HB) with office building / 10,400 sqm Peakside Capital Advisors / City Point Targówek/ warehouse / 7,200 sqm LemonTree, Wrocław/warehouse / 10,617 sqm Nestle Purina Nowa Wieś Wrocławska / pet food Factory (ph 8) / 54,110 sqm Student Depot, Warszawa / Student House with service part and garages / 18,443 sqm Panattoni, Gorzyczki / warehouse / 77,983 sqm |
Projects in the pipeline
Client confidentiality requires us not to disclose detailed information about projects in the pipeline. But we may confirm that we have a number of projects across all sectors forecast to be completed in the next 12 months
|
Please say why the company should be considered for the award
Kajima Poland combines the Japanese work ethic and the pursuit of perfection with Polish verve and out-of-the-box thinking. We have completed dozens of construction projects for logistics, production, and retail, as well as office and residential buildings. As an organization, we focus on continuous improvement and learning new skills. Kajima Poland achieved a turnover of over 1,8 billion PLN in 2022. In the period between 07.2022 and 06.2023, we delivered more than 17 buildings, which is more than 577,000 sqm. We merge the latest technologies with environmental awareness. 3D BIM project coordination allows us to synchronize design and implementation activities. During the implementation phase, we use CDE to manage documentation in real-time. We contribute to the industry through technical excellence, client service, and responsibility to our employees, our suppliers, and the environment. This is what makes KAJIMA different, and this is why KAJIMA should win this award.
|