Bydgoszcz

Award: Most investor-friendly city
City: Bydgoszcz
Financial investment budgeted in public projects in 2015: Financial outlays for public investments in 2015 (entered in the budget in the period from January to December): PLN 400,625,727 (plan as of 31.08.2015).
The most important projects completed between October 2014 and September 2015:

The most important investments completed and planned to be completed in the period from October 2014 to September 2015 (investments executed by budgetary units – ZDMiKP [Municipal Roads and Public Transport Authority])

- Intelligent Transportation Systems,

- Construction and modernisation of road lighting under the SOWA Programme,

- Bydgoszcz Municipal Bicycle,

- Redevelopment of the Western Road Junction, stage 2,

- Construction of Nowokielecka Street,

- Construction of streets and bridges in the vicinity of the Old Market,

- Construction of a tennis hall on the premises of ‘Zawisza’,

- Implementation of an innovative education system in the Kuyavian-Pomeranian Province by creating an education content distribution system, i.e. providing schools with interactive boards (10600),

- Revitalization of the Jan Kochanowski Park,

- Extension of the School Complex no. 10 at ul. Karłowicza 2 along with thermo-modernisation of existing buildings and land development, including: construction of a sports hall with a connector and comprehensive thermo-modernisation of the School Complex building,

- Construction of an indoor swimming pool at the Complex of Secondary Schools of General Education no. 4, ul. Stawowa 39,

- Modernisation of a building administered by the ‘Zawisza’ Civil-Military Sports Association at ul. Sielska 12.

Major projects planned for 2016:

- Construction of the 2nd stage of Ogińskiego Street along the section from Wojska Polskiego Street do Jana Pawła Street,

- Construction of a tram route along Kujawska Street, along the section from Kujawskie Roundabout to Bernardyńskie Roundabout, including development of the road system, reconstruction of the rail transport and purchase of the rolling stock,

- Construction of Jasieniecka Street, Trybowskiego Street and Matki Teresy z Kalkuty Street on the premises of the ‘Eskulap’ Housing Development,

- Reconstruction of Cieszkowskiego Street as part of revitalisation of the urban area in Bydgoszcz,

- reconstruction of Grunwaldzka Street along the section from the Western Road Junction to the city’s boundaries,

- Social-economic revitalisation of the Old Market and adjacent streets,

- Cycle paths,

- Improvement of transport accessibility of investment areas in Bydgoszcz – development of Wąbrzeska Street,

- Development of the East-West route along the section from the Western Road Junction to the Eastern Road Junction,

- Development of Smukalska Street along the section from Błądzimska Street to Rajska Street in Bydgoszcz,

- Construction of swimming pools (2nd stage) in the following districts: Leśne, Kapuściska, Miedzyń and Fordon,

- Construction of a sports hall at the Complex of Electrical Engineering Schools, ul. Karłowicza 20 in Bydgoszcz,

- Construction of a sports hall at the Complex of Secondary Schools of General Education no. 1, ul. Plac Wolności 9 in Bydgoszcz,

- Construction of a sports hall with a rehabilitation function at the School Complex no. 14, ul. Kcyńska 49 in Bydgoszcz,

- Construction of a primary school at ul. Gen. Tadeusza Bora Komorowskiego 2,

- Elimination of low emission sources supporting the increase of energy efficiency in Bydgoszcz – Kawka II,

- Modernisation of the Fordon Łoskoń flood bank measuring 5,960 m – reinforcement of the flood bank with a bentonite mat and geogrid,

- Reconstruction, modernisation and construction of sports venues, including construction of a canoe marina at RTW BYDGOSTIA, ul. Żupy 4,

- Revitalisation of the former Chamber Theatre Building at Grodzka Street,

- Revitalisation of Rother’s Mills: studies, concept and design works,

- Social-economic revitalisation of Stary Fordon,

- Thermo-modernisation and adaptation of the building at ul. Baczyńskiego 5 for the needs of municipal organisational entities,

- Construction of an indoor ice rink (artificially frozen) at ul. Toruńska 59,

- Revitalisation of the ASTORIA complex for sports-recreational purposes and construction of a 50-meter (indoor) swimming pool at ul. Królowej Jadwigi 23.

Major current projects:

- Construction of a bridge crossing over the Bydgoszcz Canal, including a road system,

- Construction of integrated transport nodes in Bydgoszcz (BIT CITY),

- Construction and reconstruction of storm water drainage in Bydgoszcz and sewage pre-treatment plants – outfalls of rainfall water collectors into Brda River,

- Construction of a branch of the Provincial and Municipal Library at ul. Czołgistów,

- Construction of Bydgoskich Olimpijczyków Street in Bydgoszcz,

- Improvement of transport accessibility of educational buildings at ul. Kromera in Bydgoszcz,

- Bydgoszcz Water System – revitalisation of boulevards and waterfronts, i.e. reconstruction and construction of waterfront reinforcement, reconstruction of lighting, reconstruction of cycle paths and footpaths, construction of small architecture buildings, reconstruction of the transport network and construction of water tram stops,

- Elimination of low emission sources supporting the increase of energy efficiency in Bydgoszcz,

- Modernisation of the building at ul. Techników 2 – social housing,

- Modernisation of local real property resources,

- Modernisation of a building administered by the ‘Zawisza’ Civil-Military Sports Association at ul. Sielska 12,

- Reconstruction of the regatta course in Brdyujście at ul. Wiebska,

- development and modernisation of the Fire Fighting Unit no. 1 at the National Fire Service City Headquarters,

- Thermo-modernisation of the buildings of National Fire Service City Headquarters in Bydgoszcz,

- Development of Nursery no. 20 at ul. Emilii Gierczak 8 in Bydgoszcz,

- The Rother’s Mills – security works, construction and conservation works.

Financial resources (in PLN) for investment in each of the last five years:

2010 – PLN 209,953,989,

2011 – PLN 285,050,847,

2012 – PLN 285,373,901,

2013 – PLN 229,783,137,

2014 – PLN 237,279,917.

The proportion of the city’s budget invested in projects for buildings in relation to other expenditure (in pct and PLN):

Total expenses plan as of 31.08.2015: PLN 1,774,438,609, i.e. 100 %

of which:

- current expenses PLN 1,373,438,609, i.e. 77.4 %

- capital expenses PLN 400,625,727, i.e. 22.6 %

Additionally, the city’s municipality companies are executing the following investments in 2015:

- MKUO ProNatura Sp. z o.o. – a task under the name ‘Construction of a Municipal Waste Thermal Conversion Plant for the Bydgoszcz-Toruń Metropolitan Area’,

- Tramwaj Fordon Sp. z o.o. – a task under the name ‘Construction of a Tram Line to Fordon With a Redevelopment of the Road Infrastructure in Bydgoszcz Within the Scope of Construction and Assembly Works’,

- Bydgoski Park Przemysłowo-Technologiczy Sp. z o.o., including construction of:

  • a business incubator under the name of ‘IDEA Business Space’, i.e. a 6-storey office building at ul. Bydgoskich Przemysłowców on the premises of Bydgoski Park Przemysłowo-Technologiczny (Bydgoszcz Industrial and Technological Park’,
  • ‘Bydgoskie Centrum Targowo-Wystawienniczego w Myślęcinku’ (Bydgoszcz Trade Fair and Exhibition Centre in Myślęcinek).
How many projects does the city carry out using EU funds, and what is their value?:

Projects in progress in 2015 – 42

Total value – PLN 1,406,490,082.46

How open is the city to outside investors? Does it offer special incentives and investment development programmes? What are they?:

Bydgoszcz opens itself to investors by ensuring good investment conditions through:

- creation, on the basis of the Investor Assistance and Entrepreneurship Office, of the Bydgoszcz Regional Development Agency in 2013 – a dedicated entity the purpose of which is to provide services and support to BIZ,

- ensuring appropriate infrastructure for industrial investments – creation of the Bydgoszcz Industrial and Technological Park in 2007 – 280 ha of fully equipped area included in the Local Spatial Management Plan,

- including other areas of the city in the Local Spatial Management Plan tailored to the needs of investors,

- availability of areas in the Bydgoszcz Special Economic Zone and a resolution on exemption from property tax,

- smooth performance of administrative procedures – building permits are granted in approx. 45 days,

- execution of infrastructure projects, e.g. roads and bridges.

Which factors make the city attractive to invest in? What is the potential of the city? (location, infrastructure, proximity to expressways connecting: Bydgoszcz can pride itself on:
  1. the only technical university in the region which educates engineers in the field of construction works, mechanical engineering, IT, telecommunications and chemistry
  2. availability of a skilled workforce (1 million population within a 50 km radius) acquiring experience in local manufacturing, IT and financial companies,
  3. availability of investment areas tailored to the needs of investors – 280 ha in the Bydgoszcz Industrial and Technological Park and 120 ha in the southeast part of the city,
  4. the increasing importance of the city on the communication map of Poland with a direct access to the S5 (by the end of 2019) and S10 (by the end of 2020) express road,
  5. attractive costs of living and a rich social-cultural offer, attractive real property prices.
Which major real estate investors have decided to invest in the city in 2015? Who are the potential investors in the city?:

In 2015 the city secured several strategic investment projects:

  1. Expansion of activities of companies from the BPO/SSC sector: Atos IT Services – 500 new jobs, SDL – 50 new jobs, Mobica – 50 new jobs,
  2. Development of the SPX Flow Technologies plant with a new production plant offering 200 new jobs,
  3. Execution of economic investments: IKEA – 275 new jobs, Galeria Pomorska - 500 new jobs, ECE Zielone Arkady – more than 1000 new jobs

Additionally, the city is carrying out advanced negotiations concerning two storage-logistic projects:

- project 1 - ultimately 39,000 m2 on 8 ha

- project 2 - ultimately 90,000 m2 on 18 ha

Both projects are to be executed in the first half of 2016.

How good is the zoning plan coverage?: 34%
What is the waiting time for building permits?: On average 45 days in Bydgoszcz
Why does the city deserve the award? (please stress the most important factors that make the city friendly to investors).: Bydgoszcz is the 8th largest city in Poland. It is situated at the intersection of national roads no. 5 (Nowe Marzy-Poznań section was modernized to a class S road), 10, 25 and 80 and has access to A1 motorway and the railway network connecting Silesia with the sea coast, the East and West of Poland. There is an international airport 3.5 km from the city centre. A population exceeding 1 million within a 50 km radius is an advantage. Bydgoszcz is represented by a young and educated society – the average age is 36. There are approx. 37,000 university students in Bydgoszcz and more than 11,000 graduates every year. The city offers investment incentives such as exemption from property tax and areas in the Pomeranian Special Economic Zone and Bydgoszcz Industrial and Technological Park.
Miasto: BYDGOSZCZ
Nakłady finansowe przeznaczone na inwestycje publiczne w 2015r. (zapisane w budżecie w okresie od stycznia do grudnia).: Nakłady finansowe przeznaczone na inwestycje publiczne w 2015r. (zapisane w budżecie w okresie od stycznia do grudnia): 400.625.727 zł (plan na dzień 31.08.2015r.).
Najważniejsze inwestycje zrealizowane i zaplanowane do ukończenia w okresie od października 2014 do września 2015: Najważniejsze inwestycje zrealizowane i zaplanowane do ukończenia w okresie od października 2014r.do września 2015r. (inwestycje realizowane przez jednostki budżetowe – ZDMiKP)  Inteligentne Systemy Transportowe,  Budowa i modernizacja oświetlenia ulicznego w ramach programu SOWA,  Bydgoski Rower Aglomeracyjny,  Przebudowa Węzła Zachodniego II etap,  Budowa ul. Nowokieleckiej, pozostała część odpowiedzi została wysłana na adres email: katarzyna.matejuk@eurobuildcee.com
Inwestycje planowane do rozpoczęcia na rok 2016.:  Budowa II etapu ul. Ogińskiego na odcinku od ul. Wojska Polskiego do ul. Jana Pawła,  Budowa trasy tramwajowej wzdłuż ul. Kujawskiej na odcinku od ronda Kujawskiego do ronda Bernardyńskiego wraz z rozbudową układu drogowego, przebudową infrastruktury transportu szynowego oraz zakupem taboru, pozostała część odpowiedzi została wysłana na adres email: katarzyna.matejuk@eurobuildcee.com
Inwestycje w trakcje realizacji.:  Budowa przeprawy mostowej przez Kanał Bydgoski wraz z układem drogowym,  Budowa zintegrowanych węzłów komunikacyjnych w Bydgoszczy (BIT CITY),  Budowa i przebudowa kanalizacji deszczowej na terenie Miasta Bydgoszczy i podczyszczalni ścieków na wylotach kolektorów deszczowych do rzeki Brdy, pozostała część odpowiedzi została wysłana na adres email: katarzyna.matejuk@eurobuildcee.com
Środki finansowe (w pln) przeznaczone na inwestycje w ciągu ostatnich pięciu lat z rozbiciem na poszczególne lata.: 2010r. – 209.953.989 zł, 2011r. – 285.050.847 zł, 2012r. – 285.373.901 zł, 2013r. – 229.783.137 zł, 2014r. – 237.279.917 zł.
Udział wydatków na inwestycje w budżecie miasta w 2015r. w stosunku do innych wydatków (w % i kwotowo w pln).: Plan wydatków ogółem na dzień 31.08.2015r. : 1.774.438.609 zł tj. 100 % z tego: - wydatki bieżące 1.373.438.609 zł tj. 77,4 % - wydatki majątkowe 400.625.727 zł , tj. 22.6 % pozostała część odpowiedzi została wysłana na adres email: katarzyna.matejuk@eurobuildcee.com
Ile projektów i o jakiej wartości miasto realizuje z udziałem środków unijnych?: Projekty w realizacji w 2015 r. – 42 Łączna wartość - 1 406 490 082,46 PLN
W jaki sposób miasto otwiera się na inwestorów, czy stosuje specjalne zachęty, ulgi, programy rozwoju inwestycji? Jakie?: Bydgoszcz otwiera się na inwestorów zapewniając dogodne warunki do inwestowania poprzez: - Utworzenie na bazie Referatu Obsługi Inwestora i Przedsiębiorczości w 2013r. Bydgoskiej Agencji Rozwoju Regionalnego - dedykowanej jednostki do obsługi i wsparcia BIZ - Zapewnienie właściwej infrastruktury pod inwestycje przemysłowe - utworzenie w 2007 roku Bydgoskiego Parku Przemysłowo Technologicznego - 280ha w pełni uzbrojonych terenów pokrytych MPZP - Obejmowanie kolejnych obszarów miasta MPZP dostosowanym do potrzeb inwestorów - Dostępność terenów w podstrefie Bydgoszcz SSE oraz uchwała dot. zwolnienia z podatku od nieruchomości - Sprawne przeprowadzanie procedur administracyjnych - pozwolenia na budowę średnio w 45 dni - Realizacja projektów infrastrukturalnych, np. drogi i mosty
Jakie czynniki przemawiają za atrakcyjnością miasta do inwestowania? W czym tkwi potencjał miasta? (lokalizacja, infrastruktura, bliskość dróg ekspres: Bydgoszcz może poszczycić się, m.in: a. Jedyną w regionie wyższą uczelnią techniczną, kształcącą inżynierów na kierunkach budowlanych, mechanicznych, informatycznych, telekomunikacyjnych czy chemicznych b. Dostępnością wykwalifikowanej kadry (1mln populacji w promieniu 50km), zdobywającej doświadczenie w lokalnych firmach produkcyjnych, informatycznych czy finansowych. c. Dostępnością terenów inwestycyjnych przygotowanych pod potrzeby inwestorów - 280ha w Bydgoskim Parku Przemysłowo-Technologicznym oraz 120ha w południowo-wschodniej części miasta d. Rosnącym znaczeniem miasta na komunikacyjnej mapie Polski z bezpośrednim dostępem do dróg ekspresowych S5 do 2019r. i S10 do 2020r. e. Atrakcyjne koszty życia i bogata oferta społeczno-kulturalna miasta oraz atrakcyjne koszty nieruchomości
Jakich ważnych inwestorów pozyskało miasto w 2015r. Z kim prowadzone są rozmowy?: W 2015 roku miasto zabezpieczyło kilka strategicznych projektów inwestycyjnych: 1. Poszerzenie działalności firm z sektora BPO/SSC: Atos IT Services - kolejne 500 miejsc pracy, SDL – kolejne 50 miejsc pracy, Mobica – kolejne 50 miejsc pracy, 2. Rozbudowa zakładu SPX Flow Technologies o kolejny zakład produkcyjny, który docelowo zapewni dodatkowo 200 miejsc pracy 3. Realizacja inwestycji handlowych: IKEA - 275 nowych miejsc pracy, rozbudowa Galerii Pomorskiej - 500 dodatkowych miejsc pracy, ECE Zielone Arkady - docelowo ponad 1000 nowych miejsc pracy Dodatkowo Miasto prowadzi zaawansowane rozmowy w sprawie realizacji dwóch projektów magazynowo - logistycznych: - projekt 1 - docelowo 39 000m2 na 8ha - projekt 2 - docelowo 90 000m2 na 18ha Oba projekty mają zostać zrealizowane w pierwszej połowie 2016r.
Jaki procent powierzchni miasta objęty jest planami miejscowymi?: 34% powierzchni miasta
Czas oczekiwania na pozwolenie na budowę.: Średnio 45 dni na terenie Bydgoszczy
Uzasadnienie dlaczego miasto zasługuje na nagrodę (prosimy o podkreślenie najważniejszych argumentów mogących określić miasto przyjaznym inwestorom).: Bydgoszcz jest ósmym miastem w Polsce pod względem wielkości, na przecięciu dróg krajowych Nr 5 (odcinek Nowe Marzy-Poznań zmodernizowany do klasy drogi S do 2019), 10, 25, 80, z dostępem do autostrady A1 oraz linii kolejowych łączących Śląsk i Wybrzeże, wschód i zachód kraju. Międzynarodowy port lotniczy 3,5 km od centrum. Atutem jest ponad milionowa populacja w promieniu 50 km. Bydgoszcz reprezentuje młode i wykształcone społeczeństwo – średnia wieku 36 lat. W mieście studiuje blisko 37.000 osób, co roku uczelnie opuszcza ponad 11.000 absolwentów. Miasto oferuje zachęty inwestycyjne m.in. zwolnienia z podatku od nieruchomości oraz tereny podstrefy Pomorskiej Specjalnej Strefy Ekonomicznej i Bydgoskiego Parku Przemysłowo-Technologicznego.