Name of company
Harden Construction Poland
|
Managing Director or President in Poland or Division Head
Paweł Fiuczek, Dyrektor Zarządzający w Harden Construction Łukasz Kozerski, Dyrektor Operacyjny w Harden Construction
|
Profile of Managing Director or President or Division Head in Poland
Paweł Fiuczek and Łukasz Kozerski form a professional and creative management team within the structure of Harden Construction. Their many years of experience, knowledge of the strengths and weaknesses of the industry have resulted in the development of an effective way of managing people and projects, which has meant that the company, which started from scratch in 2020, is today growing at an impressive rate. The managers, as a priority for action, chose to build a professional team of s
|
Company description including the major achievements on commercial real estate
Harden Construction is one of the fastest growing General Contractors of industrial buildings, logistics and warehouse centres, production halls and e-commerce facilities in Poland. Since 2021, the company has completed nearly 600,000 square metres of space. It builds approximately 500 square metres every day. It already has 15 completed projects in its portfolio, most of them using solutions that are unique on the domestic market. Harden builds BREEAM-certified projects and in accordance with sustainable construction principles. The company has already received 8 BREEAM certificates, mostly at the Excellent level. It has also won a prestigious award from the EcoVadis sustainability rating agency. Detailed designs, also using BIM technology, are prepared in the company's own design department. Experienced management executes and supervises the entire construction process from obtaining planning permission to handing over the building to the investor.
|
Major current clients
The company has gained trust and recognition on the Polish market as a general contractor of facilities for companies such as H&M, Carrefour Polska, Poczta Polska, TERG S.A. (Media Expert), Nissin Logistics, Inpost, Panattoni, ZING or DB Schenker.
|
Key projects constructed between July 2022 and June 2023
- Carrefour Psary BTS hall (nearly 50,000 m2). The facility is distinguished by a modern green roof (approx. 5.2 thousand m2) in the TUNDRA LIGHT system. It ensures plant vegetation and rainwater retention, as well as absorbing dust and pollutants from the air.
- a modern warehouse hall for the Media Expert Distribution Centre (47,000 sq m), which is the 3rd realisation for TERG S.A. (Media Expert) in Łódź. - a warehouse hall at the Panattoni Park Błonie III complex near Warsaw. The facility, with an area of over 43,400 m2, was built ahead of schedule and handed over to the investor after just 6 months, together with an occupancy permit. - a functional hall built for Panattoni Stryków Beta in Sosnowiec Pieńki (over 32,000 sqm.). - a production and warehouse hall built in Lisi Ogon near Bydgoszcz at Panattoni Park Bydgoszcz IV (20,000 sqm). The facility, completed in 6 months for Belma Accessories Systems, meets the requirements for BREEAM certification at the Excellent level. |
Projects under construction
Harden Construction has commissioned the largest and most modern logistics complex of the Polish Post Office in the country - the Expeditionary and Cooperative Node near Radzymin - in the fourth quarter of 2023.
Another project completed before the end of this year was the construction of two halls with a total area of over 140,000 sqm. at Panattoni Park Poznań A2 in Robakowo. One of these facilities, with an area of 79,500 sqm, was built in the built-to-suit formula for H&M. A warehouse and office hall City Logistics Łódź VI of nearly 27,000 sqm. meeting the requirements of BREEAM certification at the Excellent level was also completed. Another development is the construction of a new 65,000 sqm production and warehouse hall for a giant in the electronics industry. Harden will be the contractor for a warehouse facility at Panattoni City Logistics Warsaw VI of approximately 18,000 sqm. Construction of a hall in Natolin near Grodzisk Mazowiecki for Danfoss is underway. |
Projects in the pipeline
We have a project in the pipeline to develop a modern facility near Poznań with an area of approximately 44,000 m2 for one of the largest logistics companies in Poland.
|
Please say why the company should be considered for the award
In less than three years, Harden Construction has become one of the leading general contractors in Poland.Harden Construction has radically exceeded its plans and is steadily expanding its client portfolio in a challenging macroeconomic environment. The company has already completed buildings with a total area of 600,000 m2, realising them for renowned Polish and international clients. The company has clearly surpassed the assumptions made in 2020 of achieving annual revenues of PLN 250-300 million after three years of operation. Already in its first year of operation - 2021 - the company closed with a revenue of around PLN 280 million, while in 2022, revenue almost doubled, and in 2023, the company estimates that revenue will again significantly exceed expectations. The rapidly growing Harden Construction is setting new standards in industrial construction by making it part of the European sustainable construction strategy.
|
Company website
https://harden-construction.com
|