Generation Park is located in a perfectly communicated point of the city, near Daszyńskiego Roundabout, close to the city center and in the middle of the newly created office district. Generation Park Z is situated on the main communication routes, close to public transports stops. The main assumption of the project is to create a new place for meetings, adapted to the needs of different generations, arranged in a sustainable way. Between the office buildings of Generation Park complex will be laid special concrete pavement which cleans air pollution generated by exhaust fumes. The office building is implemented in accordance with the guidelines of WELL, LEED Platinum and Building without barriers certification.
Name of project
Generation Park Z
City
Warszawa
Location
ul. Towarowa 28
Date of completion
Q3 2019
Name(s) of investor(s)
Skanska
Developer
Skanska Property Poland
Total area (SQM)
32 800 sqm GBA
Useable Area (SQM)
26 826 sqm
Office Area (SQM)
17 500 sqm
Cubic volume
120 587,38 m3
Height
55 m
Number of above-ground floors
13
Number of underground floors
2
Number of lifts
8
Standard (class A, class B, class C)
Class A
Number of parking spaces (per sqm office space)
110
BREEAM/LEED/sustainability certification
The office building is implemented in accordance with the guidelines of WELL, LEED Platinum and Building without barriers certification.
Architect
JEMS Architekci
Construction company
Skanska S.A.
Property Management Company
Skanska Property Poland
Leasing Agency
NA
Occupancy rate
80%
Main tenants
Crido, Vistra
Source of project financing
Internal financing model
Functionality
On the 13th floor of Generation Park Z is a terrace with area of 400 sqm. This is an excellent alternative to working in the office, a great place to organize events and outdoor sports activities. There is also open space between the buildings and some garden café and restaurants.
The technical systems and innovations to improve office working conditions/comfort
• Connected by Skanska
• Building is applying for WELL Core&Shell certification
• Building without Barriers requirements implemented
• LEED Platinum certificate
• Lighting management system in offices
• LED lighting and motion sensors in common spaces and offices
• Ventilation system
Technical innovations
Efficient air-conditioning system based on chilled beams; Independent sources of power supply and a place for power generator; Building Management System; Outdoor Wireless; Own technical and sanitary facilities; Green concrete reducing smog