Bonarka for Business, Building G

Building G, the seventh element of Bonarka for Business office complex in Krakow was launched this March. The eight-storey class A building provides 10 000 sqm of gross leasable area, of which 100% is built-to-suit development for Euroclear, the Belgium based financial services company. The building has 8 above ground levels and 2 underground levels with 49 parking spaces and 50 bicycle spaces. Building G was designed with consideration for the environment, and It has received the BREEAM certificate on a very good level. The facility is provided with 4 energy efficient elevators, Building Management System and External energy-efficient (LED) light fittings, controlled through an automatic time switch and daylight sensor.
Name of project Bonarka for Business, Building G
City Krakow
Location Puszkarska 9, 30-644 Krakow, Poland
Date of completion March, 2017
Name(s) of investor(s) TriGranit
Developer TriGranit
Total area (SQM) 13532 sqm GBA
Useable Area (SQM) 11281 sqm
Office Area (SQM) 10000 sqm GLA
Cubic volume 50406 m3
Height approx. 30 m
Number of above-ground floors 8
Number of underground floors 2
Number of lifts 4
Standard (class A, class B, class C) Class A office development
Number of parking spaces (per sqm office space) 49
BREEAM/LEED/sustainability certification BREEAM “Very Good” certificate
Architect IMB ASYMETRIA, BRK SA – architecture
Construction company Arcoffice Poland Sp z o o
Property Management Company TriGranit
Leasing Agency Jones Lang LaSalle
Occupancy rate 100%
Main tenants Euroclear
Source of project financing The project was financed by bank loan (ING Bank, m-Bank) and own equity.
Short information about the Project Building G, the seventh element of Bonarka for Business office complex in Krakow was launched this March. The eight-storey class A building provides 10 000 sqm of gross leasable area, of which 100% is built-to-suit development for Euroclear, the Belgium based financial services company. The building has 8 above ground levels and 2 underground levels with 49 parking spaces and 50 bicycle spaces. Building G was designed with consideration for the environment, and It has received the BREEAM certificate on a very good level. The facility is provided with 4 energy efficient elevators, Building Management System and External energy-efficient (LED) light fittings, controlled through an automatic time switch and daylight sensor.
Functionality Office development
The technical systems and innovations to improve office working conditions/comfort - large amount of greenery with places to rest
- improved safe public road, bicycle and pedestrian paths
- “bike-box” with 50 bicycle spaces
- welfare facilities dedicated in accordance with interior layout
- adequately daylit office spaces to minimise energy consumption and provide external view
Technical innovations - implemented BMS system with extended functions
- detecting leaks on water installations
- monitoring water and energy usage
- building equipped low water use fittings to minimise the consumption of potable water in sanitary applications
- external pond which is used for retention of rainwater
Facility's website http://www.bonarka4business.pl/
Name of project
Bonarka for Business, Building G
City
Krakow
Location
Puszkarska 9, 30-644 Krakow, Poland
Date of completion
March, 2017
Name(s) of investor(s)
TriGranit
Developer
TriGranit
Total area (SQM)
13532 sqm GBA
Useable Area (SQM)
11281 sqm
Office Area (SQM)
10000 sqm GLA
Cubic volume
50406 m3
Height
approx. 30 m
Number of above-ground floors
8
Number of underground floors
2
Number of lifts
4
Standard (class A, class B, class C)
Class A office development
Number of parking spaces (per sqm office space)
49
BREEAM/LEED/sustainability certification
BREEAM “Very Good” certificate
Architect
IMB ASYMETRIA, BRK SA – architecture
Construction company
Arcoffice Poland Sp z o o
Property Management Company
TriGranit
Leasing Agency
Jones Lang LaSalle
Occupancy rate
100%
Main tenants
Euroclear
Source of project financing
The project was financed by bank loan (ING Bank, m-Bank) and own equity.
Short information about the Project
Building G, the seventh element of Bonarka for Business office complex in Krakow was launched this March. The eight-storey class A building provides 10 000 sqm of gross leasable area, of which 100% is built-to-suit development for Euroclear, the Belgium based financial services company. The building has 8 above ground levels and 2 underground levels with 49 parking spaces and 50 bicycle spaces. Building G was designed with consideration for the environment, and It has received the BREEAM certificate on a very good level. The facility is provided with 4 energy efficient elevators, Building Management System and External energy-efficient (LED) light fittings, controlled through an automatic time switch and daylight sensor.
Functionality
Office development
The technical systems and innovations to improve office working conditions/comfort
- large amount of greenery with places to rest
- improved safe public road, bicycle and pedestrian paths
- “bike-box” with 50 bicycle spaces
- welfare facilities dedicated in accordance with interior layout
- adequately daylit office spaces to minimise energy consumption and provide external view
Technical innovations
- implemented BMS system with extended functions
- detecting leaks on water installations
- monitoring water and energy usage
- building equipped low water use fittings to minimise the consumption of potable water in sanitary applications
- external pond which is used for retention of rainwater
Facility's website
http://www.bonarka4business.pl/

Main Sponsor